1. We have updated the interconnection as given ref image, which is
reflected on PV-4, PV-5 pages
2. We have updated the layout and all plans as per ballast. which is
reflected on PV-2, PV-2.1, PV-3, PV-3.1, PV-5, PV-5.1, PV-6.3, PV
6.4, PV-6.5, PV-6.6, PV-6.7, PV-6.8, PV-6.9, PV-6.10, PV-6.11, PV
6.12, PV-6.13, PV-6.14 pages.Sacramento County · 2026
(N) (01) TESLA POWERWALL 3 1707000-XX-Y (240V) BATTERY
(N) (01) TESLA BACK-UP SWITCH 1624171-XX-Y [CRD-PCS NEM]
(N) (01) LOCKABLE DISCONNECT SWITCH (IMO SI16-PEL64R-2)Marin County · 2025$15,500
(N) 5.720KW DC/11.500KW AC/5.292KW CEC AC ROOF MOUNTED PV SYSTEM
(13) JA SOLAR JAM54D41-440/MB MODULES
(01) TESLA POWERWALL 3 WITH 11.5KW BUILT-IN INVERTER 1707000-XX-Y (240V) [SI1-SB]
(01) TESLA BACKUP GATEWAY 3 1841000-X1-Y [CRD-PCS NEM]
(01) LOCKABLE DISCONNECT SWITCH (IMO SI16-PEL64R-2)
(06) TESLA SOLAR SHUTDOWN DEVICE MCI-2Marin County · 2025$36,092
(N) 1.680KW DC/1.572KW CEC AC ROOF MOUNTED PV SYSTEM
(N) (01) TESLA AC POWERWALL 3 BATTERY WITH DC EXPANSION
1978069-00-X [240V] [SI1-SB]
(N) (04) REC SOLAR REC420AA PURE 2 MODULES
(N) (02) TESLA SOLAR SHUTDOWN DEVICE MCI-1 REV01 We have updated the location of battery . See pages PV-2.1, PV
3.2, PV-5,Sacramento County · 2025$18,959
N) 7.200KW DC/6.715KW CEC AC/6.840KW AC ROOF MOUNTED PV SYSTEM
(18) REC SOLAR REC400AA PURE 2 MODULES
(18) ENPHASE IQ8X-80-M-US (240V) [SI1-SB] MICROINVERTERS
(01) ENPHASE IQ COMBINER 5/5C PANEL WITH IQ GATEWAY [CRD-PCS NEM]Marin County · 2024$30,500
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
CH-02:Updated Wire Size on Page 4Sacramento County · 2024
(N) 4.40KW DC/4.012KW CEC AC /4.22KW AC SYSTEM SIZE ROOF MOUNTED PV SYSTEM(11) SUNPOWER SOLAR SPR-A400 BLK MODULES (11) ENPHASE IQ7HS-66-M-US(240V)[SI1-SB] MICROINVERTERS (01) PV DEDICATED SUB PANEL (01) SUNPOWER PVS6 MONITORING DEVICE, CH-01 PV-2: Updated site plan to show location of new subpanel
PV-4: Updated wire diagram to show new subpanel installed in order to make room for solar breaker at
MSP. 20A “Pool” breaker and solar landed in new subpanel and then breaker landed in MSP to feed the new sub.
PV-5: Updated placard, null, CH-02:Updated Wire Size on Page 4, CO-02: Updated Wire Size on Page 4Sacramento County · 2024$19,895
CH-01 PV-2: Updated site plan to show location of new subpanel
PV-4: Updated wire diagram to show new subpanel installed in order to make room for solar breaker at
MSP. 20A “Pool” breaker and solar landed in new subpanel and then breaker landed in MSP to feed the new sub.
PV-5: Updated placardSacramento County · 2024
1 ROOF MOUNTED SMALL-SCALE SINGLE-PHASE PV ARRAY INSTALLATION 0.000kW DC WITH ENERGY STORAGE SYSTEM 10kW DC 2. GENERATION SUB PANEL, HOME LOAD SUB PANEL, TESLA GATEWAY, AC DISCONNECT & POWERWALL INSTALLATION<div><br></div><div>**Updated 11/15/23: <span style=font-family: Georgia, serif; font-size: 12pt;>1 INSTALL NEW ENERGY STORAGE SYSTEM WITH (2) 13.5kWh AC BATTERIES; </span><span style=font-family: Georgia, serif; font-size: 12pt;>2 INSTALL NEW 225A RATED SUB PANEL FOR BACKUP LOADS, 200A RATED TESLA; </span><span style=font-family: Georgia, serif; font-size: 12pt;>GATEWAY, AND REMOTE POWER OFF SWITCH; </span><span style=font-family: Georgia, serif; font-size: 12pt;>3 INSTALL (2) BOLLARDS FOR IMPACT PROTECTION; </span><span style=font-family: Georgia, serif; font-size: 12pt;>4 SEAL WALL PENETRATIONS FOR ESS EQUIPMENT; RELOCATE EXISTING; </span><span style=font-family: Georgia, serif; font-size: 12pt;>INVERTERS**</span></div>Marin County · 2023$30,400
INSTALL NEW MAIN SERVICE PANEL. 100A SERVICE TO 100A SERVICE. REMOVE/REPLACE ZINSCO PANELMarin County · 2023$500
CH-02: Wiring from main solar breaker to AC disconnect to be upsized from 10 THHN to 8 THHN due to
meter socket being rated for #8 or biggerSacramento County · 2023
*ROOF MOUNTED SMALL-SCALE SINGLE-PHASE PV ARRAY
INSTALLATION 5.950kW DC WITH ENERGY STORAGE SYSTEM 6.8kW DC
* SUNVAULT ESS, HUB+, RPO SWITCH INSTALLATION
(HOME LOADS PANEL) (NON-BACKUP LOADS PANEL)
*MODULES/INVERTER: (14) SUNPOWER SPR-M425-H-AC, CH-01, Revision to array layout and equipment locations., null
CH-02: Wiring from main solar breaker to AC disconnect to be upsized from 10 THHN to 8 THHN due to
meter socket being rated for #8 or biggerSacramento County · 2023$42,370
Permitted projects on public record. Addresses are omitted for privacy.