What the public permit record shows, not self-reported reviews.
Is HAWTHORNE CONSTRUCTION a real contractor?
HAWTHORNE CONSTRUCTION appears in public building-permit records with 12 permits filed through 2022 in and around City of Sacramento, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is HAWTHORNE CONSTRUCTION's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to HAWTHORNE CONSTRUCTION by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is HAWTHORNE CONSTRUCTION licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. HAWTHORNE CONSTRUCTION has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is HAWTHORNE CONSTRUCTION's work?
The most recent permit on record for HAWTHORNE CONSTRUCTION is dated 2022-04-08, with 12 permits on file in total.
EPC - REVISION TO COM-2125598 Because of a prospective tenant, we have revised the floor plan to include rooms 217,218, also we moved the exit corridor to allow for us to keep office 230, 231, and 231. The exit corridor wall detail was also changed because of the mechanical equipment interfered with our ability to frame the walls to underside of roof structure.City of Sacramento · 2022
EPC - Reconfigure second floor to allow for four individual tenant spaces. Work includes framing/drywall, reconfigure mechanical duct work, new LED lighting, reconfigure power, add break room plumbing and relocate fire sprinklers as needed.
*** SEE REVISION COM-2207466 Because of a prospective tenant, we have revised the floor plan to include rooms 217,218, also we moved the exit corridor to allow for us to keep office 230, 231, and 231. The exit corridor wall detail was also changed because of the mechanical equipment interfered with our ability to frame the walls to underside of roof structure. SPRINKLER HEAD THAT NEEDED TO BE RELOCATED BECAUSE OF THE EXIT CORRIDOR MOVING.
revision COM-2211039 revised mechanical drawings to reflect field conditionsCity of Sacramento · 2021$135,000
EPC - Construct new interior walls under existing T-Bar grid, including new accessible restrooms, LED light fixtures, power distribution, relocate duct work and fire sprinklers as needed.City of Sacramento · 2020$142,500
EPC - Demo existing walls, grid and floor covering. Construct new interior partition walls under grid, supply and install new LED light fixtures, add light switches and power outlets as needed, relocate duct work and fire sprinklers.City of Sacramento · 2020$82,500
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you HAWTHORNE CONSTRUCTION?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to HAWTHORNE CONSTRUCTION's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
EPC - 1.DEMOLITION OF EXISTING INTERIOR NON-STRUCTURAL PARTITIONS 2. CONSTRUCTION OF NEW INTERIOR PARTITIONS 3. NEW ACCESSIBLE RESTROOMS 4. NEW ELECTRICAL OUTLETS 5. RELOCATE EXISTING LIGHT FIXTURES 6. RELOCATE HVAC DUCTING 7. NEW FINISHES
City of Sacramento · 2020
$180,000
EXPEDITED - Construction of (2) new restroom in an area currently occupied by two offices including framing, plumbing,electrical and exhaust fans .City of Sacramento · 2019$45,000
EXPEDITED - revision to com-1906507: Add one electric panelCity of Sacramento · 2019
Remodel interior office space to include: Demo existing restrooms to create new; new restrooms (3); Framing, plumbing, electrical and mechanical upgrades: Relocation of ducting as needed. Adding lighting, outlets and switches. Plumbing for new restrooms (3). (SEE COM-1915507: Add one electrical panel)City of Sacramento · 2019$150,000
EXPEDITED - space 205-Demo existing walls and carpet. interior construction to include new partiton walls under grid power to new office, new LED light fixtures, relocate HVAC duct and fire sprinkler heads as neededCity of Sacramento · 2018$38,600
remove and replace damaged masonry brick/windows like for like.City of Sacramento · 2018$35,000
Demolition of two walls, construction of new interior walls for two new offices. Work also includes two new doors, electrical power to each office, relocating four(4) light fixtures, relocate sprinkler heads and air supply ducts.City of Sacramento · 2018$12,500
remove existing chain link fence and replace with 177.6 sq ft 6ft block wall same foot printCity of Sacramento · 2017$20,000
Permitted projects on public record. Addresses are omitted for privacy.