5.265kW DC Rooftop PV solar installation with 13.5kWh battery storage, using Snapnrack Ultra Rail and Tesla Powerwall ESS. MCI’s provide rapid shutdown.Sacramento County · 2025$60,320
Installing a Level 2 hard-wired EV charger with a 40A breakerSacramento County · 2025$3,000
Install N 100a Virtual Net Metering Flush Tilt Roof Mounted Photovoltaic SystemMarin County · 2025
Install 1 40A level 2 EV charger, tied into main service panel.Sacramento County · 2024$2,000
Additions/AlterationsCity of San Jose · 2024$30,396
Install a 5.07kW solar system using 13 390W modules and 13 240V microinverters, mounted and secure to the roof.Marin County · 2023$22,095
Install a 5.07kW Solar System using 13 390W modules and 13 240V microinverters, mounted and secured to the roof.
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Marin County · 2023
$22,119
Install rooftop PV Solar and (1) level 2 40A EV Charger. Load calcs are provided. A new subpanel is installed to provide room for the new PV and EV circuits, and 2 existing loads are relocated to it.Sacramento County · 2023$21,186
SolarApp ID: SA20231004-2133-215-6189-A; Rooftop Grid-tied PV solar installation, using Snapnrack Ultra Rail and Enphase IQ microinvertersSacramento County · 2023$16,626
Install a 40A level 2 EV charger, tied into main service panel.Sacramento County · 2023$2,000
Installing (1) level 2 Juicebox 32 electric vehicle charger, tied into main service panel.Sacramento County · 2023$2,000