What the public permit record shows, not self-reported reviews.
Is GREEN OPTIONS ELECTRIC a real contractor?
GREEN OPTIONS ELECTRIC appears in public building-permit records with 9 permits filed through 2025 in and around City of Sacramento, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is GREEN OPTIONS ELECTRIC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to GREEN OPTIONS ELECTRIC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is GREEN OPTIONS ELECTRIC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. GREEN OPTIONS ELECTRIC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is GREEN OPTIONS ELECTRIC's work?
The most recent permit on record for GREEN OPTIONS ELECTRIC is dated 2025-11-07, with 9 permits on file in total.
Recent permitted projects
Installation Of 2 Ev Charging StationsMarin County · 2025$18,000
Installation Of 2 Ev Charging StationsMarin County · 2025$10,000
INSTALLATION OF 14-50R OUTLET attached to header GARAGE. 3/4 EMT, (3) #6AWG (1) #10AWG GREEEN (1) 50 AMP ZINSCO 2 POLE BREAKER
Have the new device specifications printed and available for your field inspector.
Issued ***SUBJECT TO FIELD APPROVAL***Sacramento County · 2021$1,250
INSTALLATION OF 60 AMP CIRCUIT FOR EV CHARGER LOCATED IN THE GARAGE. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt). ALL WORK SUBJECT TO FIELD INSPECTION.City of Sacramento · 2023$800
INSTALL OF LEVEL 2 EV WALL MOUNTED CHARGING STATION
Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. ALL WORK SUBJECT TO FIELD INSPECTION
Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994, are exempt).City of Sacramento · 2022$800
INSTALLATION OF 50 AMP OUTLET FOR PORTABLE CHARGER AND A DCC-12 EV CONTROLLER OUTSIDE TO MAIN SERVICE PANEL. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314.
Area served
City of Sacramento, Marin County, Sacramento County
Use this data — free
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you GREEN OPTIONS ELECTRIC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to GREEN OPTIONS ELECTRIC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Sacramento · 2022
$1,500
Installation of 50 amp outlet for portable charger and a DCC-12 EV controller. Outside next to main service panel. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314.City of Sacramento · 2022$1,500
Install EV ChargerCity of Sacramento · 2022$1,500
INSTALLATION OF 14-50R OUTLET ON CENTER POST IN GARAGE. 3/4 EMT, (3) #6AWG (1) #10AWG GREEEN (1) 50 AMP ZINSCO 2 POLE BREAKER
Have the new device specifications printed and available for your field inspector.
Issued ***SUBJECT TO FIELD APPROVAL***Sacramento County · 2021$1,250
Permitted projects on public record. Addresses are omitted for privacy.