What the public permit record shows, not self-reported reviews.
Is FOREST MECHANICAL a real contractor?
FOREST MECHANICAL appears in public building-permit records with 6 permits filed through 2025 in and around City of Sacramento, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is FOREST MECHANICAL's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to FOREST MECHANICAL by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is FOREST MECHANICAL licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. FOREST MECHANICAL has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is FOREST MECHANICAL's work?
The most recent permit on record for FOREST MECHANICAL is dated 2025-08-15, with 6 permits on file in total.
Changeout to existing HVAC system only. No additional electrical, mechanical, plumbing, or structural work permitted.; Install 2 split systems. Minimal duct work.Sacramento County · 2025$20,000
Changeout to existing HVAC system only. No additional electrical, mechanical, plumbing, or structural work permitted.; Replacing old furnace with new variable speed heat pump. Replacing all duct work with R8Sacramento County · 2025$16,500
Changeout to existing HVAC system only. No additional electrical, mechanical, plumbing, or structural work permitted.; Changeout to existing HVAC system only. No additional electrical, mechanical, plumbing, or structural work permitted.; Replacing old furnace with new high efficiency heat pump. Replacing all duct work with R8Sacramento County · 2025$18,000
No Duct Work Permitted. Change-out Split System to Split System (all-electric heat pump). The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%.City of Sacramento · 2025$14,000
EPC - THE SCOPE OF THIS PROJECT INCLUDES THE DEMOLITION AND REPLACEMENT OF INFRARED HEATERS (IH) WITH NEW UNIT HEATERS (UH). DEMO ALL INFRARED HEATERS (IH-1 THRU IH-9) AND EXISTING FLUES. INSTALL [NJ UNIT HEATERS [UH-I THRU UH-I I) AND (N) FLUES. NEW EQUIPMENT TO USE NEW ELECTRICAL SERVICE AND GAS PIPING AS REQUIRED.City of Sacramento · 2024$44,000
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you FOREST MECHANICAL?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to FOREST MECHANICAL's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
No Duct Work Permitted. Change-out Roof Mount to Roof Mount. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%.City of Sacramento · 2022$10,500
Permitted projects on public record. Addresses are omitted for privacy.