What the public permit record shows, not self-reported reviews.
Is EXCEL ROOFING a real contractor?
EXCEL ROOFING appears in public building-permit records with 10 permits filed through 2018 in and around City of Sacramento, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is EXCEL ROOFING's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to EXCEL ROOFING by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is EXCEL ROOFING licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. EXCEL ROOFING has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is EXCEL ROOFING's work?
The most recent permit on record for EXCEL ROOFING is dated 2018-07-20, with 10 permits on file in total.
REROOF 1,000SQFT COMP TO COMP: Tear Off - Yes, Resheet - No, 1 layer(s), 10 squares of 30yr Laminated Dimensional Composition. CRRC: 0668-0071 Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314City of Sacramento · 2018$4,000
E-Permit: Tear Off - Yes, Resheet - No, 1 layer(s), 16 squares of 30yr Laminated Dimensional Composition. CRRC: 0668-0129. Reroof on both SFR and Detached Garage. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314City of Sacramento · 2018$6,000
Tear Off - Yes, Resheet - Yes, 1 layer(s), 31 squares of 30yr Laminated Dimensional Composition. In-progress inspection required if 10 squares or greater.City of Sacramento · 2017$13,330
REROOF (Units1 thru 4) Tear existing 3 tab comp, RESHEATH entire roof and will replace with 1 layer(s), 16 squares of 50yr Laminated Dimensional Composition. CRRC: 0890-000; Lower fascia board to be replaced ( 60 ft +/-), Removing and replacing upper fascia - corbel brackets - like for like, New gutters to be replaced at the flats and front of building. In-progress inspection required if 10 sq or greater. at final inspection. Carbon monoxide & Smoke alarms required. Reference 2013 CRC sections R315 & R314
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you EXCEL ROOFING?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.