What the public permit record shows, not self-reported reviews.
Is CHARGIE LLC a real contractor?
CHARGIE LLC appears in public building-permit records with 17 permits filed through 2025 in and around City of Sacramento, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is CHARGIE LLC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to CHARGIE LLC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is CHARGIE LLC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. CHARGIE LLC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is CHARGIE LLC's work?
The most recent permit on record for CHARGIE LLC is dated 2025-09-15, with 17 permits on file in total.
INSTALL 1 ELECTRIC VEHICLE CHARGING STATIONS FOR 2 PARKING SPACES. (MAIN) FOR CBNC2024-00098 - CBNC2024-00099 REV01 Install (2) L2 EV chargersSacramento County · 2025$9,720
INSTALL 3 ELECTRIC VEHICLE CHARGING STATIONS FOR 6 PARKING SPACES. (SUB) FOR CBNC2024-00097 REV01 Install (6) L2 EV chargers
REVISED ONE LINE AND PANEL SCHEDULESacramento County · 2025$29,161
INSTALL 1 ELECTRIC VEHICLE CHARGING STATION FOR 2 PARKING SPACES. (SUB) FOR CBNC2024-00097Sacramento County · 2025$9,720
CH-01 - We updated the plans to reflect the items below and to add the verbiage for Section 11B.
Add 100A breaker to disconnecting means on panel.
Move connection point after meter and 200 amp CB.Sacramento County · 2023
Installation of 4 EV level 2 chargers, 2 pedestal mounted, 2 wall mounted 50ft of trenching, 1 load controller and 1 new 40 amp circuit., CH-01 - We updated the plans to reflect the items below and to add the verbiage for Section 11B.
Add 100A breaker to disconnecting means on panel.
Move connection point after meter and 200 amp CB.Sacramento County · 2023$16,000
Install 8 load controlled EV car chargers on 2 dedicated 40 amp circuits fed from the main house meter, trench for underground conduits and install pedestals.Sacramento County · 2022
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you CHARGIE LLC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
$35,000
EPC - INSTALL 20 EVCS AND (1) GATEWAY THAT'S FED THROUGH 150A PANELBOARD WITH 150A MAIN BREAKER . (20) CHARGERS
SHALL BE PEDESTAL MOUNTED AND PROTECTED WITH A BOLLARD.
SEE REVISION COM-2603648: REDUCED NUMBER OF EV CHARGING STATIONS, 150 AMP PANEL REMOVED, 150 AMP BREAKER REMOVED. 125 AMP PANEL ADDED, AND 100 AMP MAIN BREAKER ADDE.City of Sacramento · 2025$100,000
EPC - Install (83) L2 EV chargers at the Grove Apartments.City of Sacramento · 2025$367,812
Install (20) wall-mounted L2 EV charges, (1) 250A 120/208V 3P sub panel, (1) 250A/3P breaker, (10) 40A/2P, (1) 20A/1PCity of Sacramento · 2025$135,000
EPC - INSTALL 8 EV CHARGING STATIONS TO LOAD CENTER AND GATEWAY.
SEE REVISION COM-2508776City of Sacramento · 2024$40,000
EPC - INSTALL 9 EV CHARGING STATIONS TO EXISTING LOAD CENTER AND GATEWAY. Conduit will be exposed and clipped to the ceiling.City of Sacramento · 2024$45,000
EPC - INSTALL 10 EV CHARGING STATIONS TO EXISTING LOAD CENTER AND GATEWAY.City of Sacramento · 2024$45,000