Remove (20) solar panels, rail and feet. Reinstall rail and (20) solar panels for re-roof. (We are only doing the removal and re-install of solar panels, not the re-roof).Sacramento County · 2026$12,565
Roof Mounted Solar Expansion, tie into existing inverter 1.64Sacramento County · 2025$8,435
Install 3.36 KW Roof Mounted Solar PV on ADU
Associated record for ADU CBNR2025-00158Sacramento County · 2025$14,315
Remove Enphase Batteries & Enphase Microinverters and Install 2 New Tesla Powerwall 3 and Add MCISacramento County · 2025$38,470
Install roof mounted solar PV 5.04 kW and 2 Tesla Powerwall3 27kWh ESSSacramento County · 2025$53,386
Installed roof mounted solar PV 12.3 KW and 2 Tesla Powerwall 3 27 KW ESSSacramento County · 2024$76,062
CH-01: Change MPU from 200amp to 100amp per SMUD approval for in ground wireSacramento County · 2024
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
THIS PROJECT ENTAILS THE INSTALLATION OF A ROOF-TOP
PHOTOVOLTAIC SYSTEM. INSTALLATION INCLUDES A MAIN
PANEL UPGRADE 200A AND A NEW 40A EV CIRCUIT FOR FUTURE
EV., CH-01: Change MPU from 200amp to 100amp per SMUD approval for in ground wireSacramento County · 2024$15,000
Install Roof Mounted Solar PV 5.32 and a EV outlet and a Main Panel Upgrade from 100amp to 100 ampSacramento County · 2024$15,000
ch-01 Change main panel upgrade from 200A to 125A per SMUD approvalSacramento County · 2024
Install Roof Mounted Solar PV 6.46 KW, Main Panel Upgrade and EV outlet, ch-01 Change main panel upgrade from 200A to 125A per SMUD approvalSacramento County · 2024$15,000
Install Roof Mounted 6.84KW & EV 14-50 receptacle & MSP like for like 200 amp.Sacramento County · 2024$15,000
Permitted projects on public record. Addresses are omitted for privacy.