Roof and Carport mounted PV solar system with two interconnections. Total system size 245.12 kW DC.; 238 233 inspections are required prior to setting panels. /*Terracina Wildhawk Phase 1 PV (Buildings 1 and 2)Sacramento County · 2025$735,360
Roof and Carport mounted PV solar system with three interconnections. Total system size 247.5 kW DC; 238 233 inspections are required prior to setting panels. /*Terracina Wildhawk Phase 3 PV (Buildings 5 and 6)Sacramento County · 2025$742,500
Roof and Carport mounted PV solar system with two interconnections. Total system size 249.8 kW DC.; 238 233 inspections are required prior to setting panels. /*Terracina Wildhawk Phase 2 PV (Buildings 3 and 4)Sacramento County · 2025$749,400
Roof mounted ballasted PV system with 1472 modules each at 540W with 12 inverters, 9 at 60kw and 3 at 50kw. Total system size is 794.88 kW DC STC and 736.7 kW AC CEC., CH-01 - . Updated each of the 4 arrays layout per as-built field conditions.
Electrical scheme and PV module count does not change, only minor array arrangement modifications updated. Please see sheets PV-0.1, PV-1.0, PV-1.1 and structural sheets S1.0 –S1.4 for updates. Please also see updated ballast system calculations provided.Sacramento County · 2025$1,224,799
CH-01 - . Updated each of the 4 arrays layout per as-built field conditions.
Electrical scheme and PV module count does not change, only minor array arrangement modifications updated. Please see sheets PV-0.1, PV-1.0, PV-1.1 and structural sheets S1.0 –S1.4 for updates. Please also see updated ballast system calculations provided.
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Sacramento County · 2025
Installation of 10.36kW-dc PV solarMarin County · 2024$8,000
CROSS STREET: Via Vigneto
Description of Work: HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade).
This Permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements.
PerSection 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. above the highest point of the existing roof.San Diego County · 2022
CROSS STREET: Via Vigneto
Description of Work: HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade).
This Permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements.
PerSection 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. above the highest point of the existing roof.San Diego County · 2022
CROSS STREET: Via Tiglio
Description of Work: HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade).
This Permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements.
PerSection 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. above the highest point of the existing roof.San Diego County · 2022
Additions/AlterationsCity of San Jose · 2021$489,686
Cross Street: SAN PASQUAL
Description of Work: GROUND MOUNT COMMERCIAL SOLAR PV
NO. OF MODULES: 390
NO. OF INVERTERS: 3
TOTAL SYSTEM SIZE IN KILOWATTS: 166
Per Section 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5' above the highest point of the existing roof.San Diego County · 2021
CROSS STREET: Via Vigneto
Description of Work: HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade).
This Permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements.
PerSection 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. above the highest point of the existing roof.San Diego County · 2021
Permitted projects on public record. Addresses are omitted for privacy.