Enclose laundry room, approximately 63 square feet, with an L-shaped framed wall under existing covered porch. Please see Cover Sheet, Drawing Number 1, listed details 1-10., CH-01 See scope of work on -01 plans.Sacramento County · 2024$10,603
Revision CH-02
Solar sheets single line diagram pages 1, and 3, 9.
PV modules and inverters changed manufacturer.
Conductor gage change.Sacramento County · 2024
588 SF New ADU, CH011. The following changes have been made:
a. Relocated solar equipment to right side of ADU.
b. New Main panel with meter (100A) for ADU to be located on main unit.
c. 100A main panel to serve ADU load center panel (125A main lug fed).
d. Use 15A 2 pole breaker @ 125A load center.
e. Existing 100A panel that serves main unit, located on main unit, to be replaced with
new panel & meter (225A busbar W/ 200Amp breaker).
f. Revised on solar sheets, 1,2,3,4. Main plan sheets, A2, A3, E1., Revision CH-02
Solar sheets single line diagram pages 1, and 3, 9.
PV modules and inverters changed manufacturer.
Conductor gage change.Sacramento County · 2024$97,655
CH011. The following changes have been made:
a. Relocated solar equipment to right side of ADU.
b. New Main panel with meter (100A) for ADU to be located on main unit.
c. 100A main panel to serve ADU load center panel (125A main lug fed).
d. Use 15A 2 pole breaker @ 125A load center.
e. Existing 100A panel that serves main unit, located on main unit, to be replaced with
new panel & meter (225A busbar W/ 200Amp breaker).
f. Revised on solar sheets, 1,2,3,4. Main plan sheets, A2, A3, E1.Sacramento County · 2024
New consturction of a 289 SF guest house and 654 SF garage., CH-01 rearrange MSP
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Sacramento County · 2023
$91,475
Bathroom Remodel Permit: Remove and replace cabinets, counters. Remove and replace plumbing fixtures. Remove and replace electrical fixtures. Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994, are exempt). Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314.City of Sacramento · 2025$21,385
Bathroom Remodel Permit: Bathroom 1- Remove tub and fireplace with shower. Remove and replace toilet, vanity, and floor. No wall changes. Bathroom 2: Remove and replace toilet and install Lit/Fan combo. Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994, are exempt). Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314.City of Sacramento · 2025$24,220
CH-01 CH-01 See scope of work on -01 plans.Sacramento County · 2025
EPC - 60 S F Pantry addition. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314, Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994, are exempt).”City of Sacramento · 2024$57,342
EPC - 292 SF addition, bath remodel and electric panel upgrade. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314, Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt).”City of Sacramento · 2024$130,000
Remove 2 existing electric panels and replace with 400 AMP single meter panelSacramento County · 2024
EPC - 85sqft Master Bathroom addition to the rear of the house.
Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314, Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt).”City of Sacramento · 2023$93,683