What the public permit record shows, not self-reported reviews.
Is BARRIER SOLAR INC a real contractor?
BARRIER SOLAR INC appears in public building-permit records with 9 permits filed through 2025 in and around City of Sacramento, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is BARRIER SOLAR INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to BARRIER SOLAR INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is BARRIER SOLAR INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. BARRIER SOLAR INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is BARRIER SOLAR INC's work?
The most recent permit on record for BARRIER SOLAR INC is dated 2025-04-04, with 9 permits on file in total.
SUPPLY, INSTALLATION & COMMISSIONING 6.63 KW SOLAR PV SYSTEM; 238 233 inspections are required prior to setting panels.Sacramento County · 2025$25,000
8.6kw Solar PV System, and nullgal Solar WH System (water heater installed null).City of Sacramento · 2025$1,000
EPC - REVISION TO COM-2425984 ELECTRICAL CONNECTION CHANGED FROM LINE SIDE TAP TO CIRCUIT BREAKER ON PV-3 (PLAN SHEET PAGE NO:PV-3)City of Sacramento · 2024
EPC - 9.36kw Solar PV System, and 0gal Solar WH System (water heater installed null).City of Sacramento · 2024$35,000
EPC - 12.87kw Solar PV System, and 0gal Solar WH System (water heater installed null).
SEE REVISION COM-2427700 ELECTRICAL CONNECTION CHANGED FROM LINE SIDE TAP TO CIRCUIT BREAKER ON PV-3 (PLAN SHEET PAGE NO:PV-3)
SEE REVISION COM-2505451: Structure Layout, changed from Ironridge AIRE Rail to Ironridge XR 100 Rail with attachments
2. Electrical Line Diagram, changed from PV Breaker to Line Side Tap
SEE REVISION COM-2506534: Correction From Inspector: Electrical Connection Changed from Line Side Tap to Load Side Tap on PV-3 (Plan Sheet Page No: PV-3)
SEE REVISION COM-2508284: Upgrade Cable SizeCity of Sacramento · 2024$45,000
EPC - 8.58kw Solar PV System,
revision COM-2503782
Corrections from inspector. Trench detail and Site plan added to plans for underground electrical run.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you BARRIER SOLAR INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to BARRIER SOLAR INC's website. It links to this profile so homeowners can see the public permit record behind your work.