What the public permit record shows, not self-reported reviews.
Is AVAIL SERVICES INC a real contractor?
AVAIL SERVICES INC appears in public building-permit records with 27 permits filed through 2026 in and around City of Sacramento, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is AVAIL SERVICES INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to AVAIL SERVICES INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is AVAIL SERVICES INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. AVAIL SERVICES INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is AVAIL SERVICES INC's work?
The most recent permit on record for AVAIL SERVICES INC is dated 2026-06-09, with 27 permits on file in total.
Install of (1) EVSE Single handle Level 2 Tesla Wall mounted charger for Employee use only (fleet) and EPO safety switch. W/ new panel.Sacramento County · 2024$2,825
Installation of (6) OP-Connect ICS/SC3 Single Port Electric Vehicle Chargers Level 2 In Parking Lot Exterior near main officeSacramento County · 2023$50,650
Installation of (2) Level 2 EVSE 40 amp 240v EVSE charging stations on a single pedestal in parking lot space w-stripping and signage (ADA Compliance) & Bollard Install., CH-01 - (3) ENELWAY SINGLE HANDLE, JUICE-BOX PRO 40 LEVEL 2 EV CHARGERS, (2) ENELWAY JUICESTAND PROSacramento County · 2023$39,000
CH-01 - (3) ENELWAY SINGLE HANDLE, JUICE-BOX PRO 40 LEVEL 2 EV CHARGERS, (2) ENELWAY JUICESTAND PROSacramento County · 2023
Installation of (4) Level 2 EVSE 40 amp 240v dual charging stations (2 Pedestals) in parking lot spaces w-stripping and signage (ADA Compliance) & Bollard Install.Sacramento County · 2023$33,349
Installation of New customer owned service pole for 200amp service and install of 200 amp panel (single phase 120/240v) and the installation and electrical connections for (2) Dual Port EV Chargers for private resident use only in parking lot area
EVCS: Customer owned service pole, panel and (2) Dual port EV ChaSacramento County · 2026
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you AVAIL SERVICES INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to AVAIL SERVICES INC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
$63,000
EPC - Installation and electrically connect a new 200amp sub panel and (8) EV Level 2 Tesla Gen3 Chargers for the exclusive use of Vibe Staff (employee only) in gated parking area.City of Sacramento · 2025$21,000
EPC - TEMP POWER FOR CONSTRUCTION: Installation of temp switchgear, SMUD apprvd 200amp 4W 3P, for connection of temporary power service provided by SMUDCity of Sacramento · 2025$20,000
EPC - Installation and Electrification of (8) handle BTC Brand DC Superchargers (4) Cabinets, (N) 3000A Switchgear and (N)SMUD Transformer/Meter and Install of (4) (N) 75w LED Pole LightsCity of Sacramento · 2025$805,000
EPC - -INSTALL AND ELECTRICALLY CONNECT (16) TESLA GEN 3 EV CHARGERS ON BASEMENT
LEVEL OF THE PARKING GARAGE FOR RESIDENT USE IN GATED/CARD ACCESS ONLY
-INSTALL AND ELECTRICALLY CONNECT (8) TESLA GEN 3 EV CHARGERS ON LEVEL 1 OF THE
PARKING GARAGE FOR RESIDENT USE IN GATED/CARD ACCESS ONLY
-INSTALL AND ELECTRICALLY CONNECT (8) TESLA GEN 3 EV CHARGERS ON LEVEL 2 OF THE
PARKING GARAGE FOR RESIDENT USE IN GATED/CARD ACCESS ONLYCity of Sacramento · 2025$92,500
EPC - Install and Electrically connect (8) Level 2 Tesla Gen 3 EV chargers on level one of the parking garage for resident use only - Gated/Card access to resident garage
Install and Electrically connect (8) Level 2 Tesla Gen 3 EV chargers on level two of the parking garage for resident use only - Gated/Card access to resident garageCity of Sacramento · 2025$52,500
EPC - TO BE INSTALLED ON 728, 734, 738, & 742 EL CAMINO AVE - INSTALLATION OF (6) TESLA LEVEL 2 EV CHARGERS W-EPO, UPGRADING ELECTRICAL INFRASTRUCTURE TO INCLUDE: (N) SWITCHGEAR 1200A 120/208V 3P 4W, (N) STEP UP TRANSFORMER 225KVA 208/240V 3P 4W, (N) 800A PANEL 120/240V 3P 4W, (N) 250A SUB PANEL 120/240V & NEW GROUND MOUNT SMUD TRANSFORMER 120/208V 3 PHASE 4WCity of Sacramento · 2025$314,717
Permitted projects on public record. Addresses are omitted for privacy.