Add or replace antennas, ancillary equipment and ground equipment as per plans for an existing carrier on an existing wireless communication facility. No tower height extension or compound expansion proposed
TOWER SCOPE OF WORK:
•REMOVE (3) ERICSSON - RRUS-32 B66A RADIOS
•REMOVE (3) ERICSSON - RRUS-32 B2 RADIOS
•REMOVE (3) COMMSCOPE - CBC78T-DS-43 DIPLEXERS
•REMOVE (3) BACK TO BACK MOUNTS
•RELOCATE (3) ERICSSON - 4478 B14 RADIOS
•INSTALL (3) ERICSSON - AIR6419 B77G ANTENNAS
•INSTALL (3) ERCISSON - 4890 B25/B66 RRUS
•INSTALL (3) ERICSSON - SXK 1255394/2 BACK TO BACK MOUNTS
•INSTALL MOUNT MODIFICATIONS PER CONDITIONAL PASSING MOUNT ANALYSIS BY TELAMON DATED OCTOBER 11, 2024
•PAINT NEW EQUIPMENT TO MATCH EXISTING
GROUND SCOPE OF WORK:
•INSTALL (3) RECTIFIERSSacramento County · 2025$35,000
AT&T Modifications - 272926
TOWER WORK:
INSTALL MOUNT MODIFICATION(S) AND (3) ANTENNA(S). (3) ANTENNA(S) TO BE RELOCATED.
GROUND WORK:
INSTALL (1) VERTIV -58VDC CONVERTER SHEL(VES), (1) VERTIV -48V RECTIFIER(S), (2) VERTIV -58V CONVERTER(S), (4) POWERSAFE SBS 190F BATTER(IES), AND (3) 50A AIR 6472 B77G B77M DC BREAKER(S).Sacramento County · 2025$20,000
Proposed AT&T collocation on existing monopole telecommunications facility. Install (1) new 10' x 13'-.6" pad, (12) antennas, (15) RRUs, (3) Surge suppressors and associated equipment on tower. Install associated cabinets and ground equipment. Route utilities within parking lot to proposed lease area.
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Sacramento County · 2025
$200,000
TOWER SCOPE OF WORK:
•REMOVE (3) ERICSSON - RRUS-32 B2 RADIOS
•REMOVE (3) ERICSSON - RRUS-32 B66A RADIOS
•INSTALL MOUNT MODIFICATIONS PER MOUNT ANALYSIS BY B+T GROUP DATED NOVEMBER 12, 2024
•INSTALL (3) ERICSSON - AIR6419 B77G ANTENNAS
•INSTALL (3) ERICSSON - 4890 B25/66 RADIOS
•INSTALL (1) COMMSCOPE - RFFT-36SM-001-XXM FIBER TRUNK
GROUND SCOPE OF WORK:
•SWAP BTS #3 DUAL POLE 60A BREAKERS IN TESSCO PANEL & RUN CIRCUIT TO POWER PLANT FOR RECTIFIER SHELF
•INSTALL (1) -58V CONVERSION KIT
•INSTALL (12) RECTIFIERS
•INSTALL (11) -58V CONVERTERS /*Add or replace antennas, ancillary equipment and ground equipment as per plans for an existing carrier on an existing wireless communication facility. No tower height extension or compound expansion proposedSacramento County · 2025$35,000
Verizon Wireless unmanned telecommunications facility consisting of installing: lease area inside Everest Lease area w/ raised steel equipment platform w/ outdoor cabinets & standby diesel generator & utilities to site location.
Everest monopole w/ antennas & antenna equipment. /*Verizon Wireless antenna and equipment addition to Everest Partners new/existing wireless telecommunications facilitySacramento County · 2025$271,000
THE PROPOSED PROJECT INCLUDES INSTALLING EQUIPMENT
CABINETS AND A GENERATOR ON A PROPOSED CONCRETE
PAD/PLATFORM INSIDE A 275 SQ. FT. GROUND SPACE WITHIN
THE EXISTING COMPOUND, AND INSTALLING THE FOLLOWING
NEW EQUIPMENT AND MOUNTS ON THE EXISTING TOWER:
(6) PANEL ANTENNAS
(12) RRH'S
(3) SECTOR FRAME MOUNTS
(3) OVP'S
(3) FIBER TRUNKS
(9) DC TRUNKS
(6) 2" CONDUITSSacramento County · 2025$50,000
T-Mobile proposes to add 3 antennas and 3 RRUs inside a "stealth" church steeple, install a new equipment cabinet and additional antenna cables, install a new heat exhaust fan inside the steeple and install small louvers on the back of the steeple, and install a screen wall around a portion of the existing equipment area.Sacramento County · 2025$15,000
Install DC power plant cabinet and battery cabinet, Install Purcell cabinet, Install (6) surge protectors, Install new fiber and DC cables to new antennas, Install utility cabinets and H-frame, Install (1) new GPS antenna, Install (3) 24 pair fiber trunks (9) DC trunks and (6) 2" inner ducts, Install (3) fiber management boxes, Install (12) panel antennas, Install (3) sector mounts, Install (15) radios, Install new 15'-0" monopole extensionSacramento County · 2025$75,000
T-Mobile's Power Upgrade Project SC70163A - Install a new 200A/2P circuit breaker. Install a new electrical distribution panel and generator interface. Upgrade Underground conductors to (3)#3/0 & (1) #4 GND.Sacramento County · 2025$30,000
Remove and replace 6102 cabinet with new RBS 6160 cabinet.
Remove and replace existing antenna mast with new tower extension.
Remove and replace (3) existing T-Mobile antennas with (3) new T-Mobile antennas.
Remove and replace (12) existing 7/8" coax with (2) new hybrid cables.
Relocate (3) existing T-Mobile antennas.
Relocate (3) existing RRU units.
Remove (6) TMA units.
Install new V-frame antenna mount.
Install (3) new RRUS-4460 units near antennas.
(T-Mobile SC06714A DRIP)Sacramento County · 2024$45,000