What the public permit record shows, not self-reported reviews.
Is AMAZZA CONSTRUCTION a real contractor?
AMAZZA CONSTRUCTION appears in public building-permit records with 12 permits filed through 2025 in and around City of Sacramento, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is AMAZZA CONSTRUCTION's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to AMAZZA CONSTRUCTION by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is AMAZZA CONSTRUCTION licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. AMAZZA CONSTRUCTION has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is AMAZZA CONSTRUCTION's work?
The most recent permit on record for AMAZZA CONSTRUCTION is dated 2025-08-11, with 12 permits on file in total.
Replace 11 window on north and east side of houseSacramento County · 2025$10,000
Demolish and dispose of detached garage for new building on separate permit.City of Sacramento · 2021$30,000
EPC - NEW 440 SQ FT Detached Garage with electrical and exterior plumbing, electrical for outdoor sink, fridge and grill.- Shared Plans with RES-2100218, Reviewed under RES-2100218.
Demo of existing detached garage to include removing roof and walls, existing slab to remain, wrecking permit not required. Exceeds limits of reconstruction.
****REVISION TO RES-2107311: DELTA #3 Revisions is to Remove and Replace the existing foundation of the original garage because the existing was not built correct.
(Wrecking permit required for the removal of the existing foundation)***City of Sacramento · 2021$30,000
Add bedroom and bathroom to second floor above garage. Change out main electrical panel to 400amp to meet new requirementsSacramento County · 2021$80,000
Add bedroom and bathroom to second floor above garage. Change out main electrical panel to 400amp to meet new requirementsSacramento County · 2021$80,000
EPC - REMODEL/RESTORATION OF AN EXISTING 2 STORY HOUSE. NEW WINDOWS AND DOORS. REWIRE ELECTRICAL. NEW MECHANICAL. REMODEL EXISTING BATHROOMS AND KITCHEN. Shared Plans with RES-2107311, Reviewed under RES-2100218.
Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314, Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt).”
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you AMAZZA CONSTRUCTION?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to AMAZZA CONSTRUCTION's website. It links to this profile so homeowners can see the public permit record behind your work.