What the public permit record shows, not self-reported reviews.
Is ALPHA OMEGA ELECTRIC a real contractor?
ALPHA OMEGA ELECTRIC appears in public building-permit records with 10 permits filed through 2019 in and around City of Sacramento, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is ALPHA OMEGA ELECTRIC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to ALPHA OMEGA ELECTRIC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is ALPHA OMEGA ELECTRIC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. ALPHA OMEGA ELECTRIC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is ALPHA OMEGA ELECTRIC's work?
The most recent permit on record for ALPHA OMEGA ELECTRIC is dated 2019-08-13, with 10 permits on file in total.
AA: existing panel 125 Amps - Underground service, new main panel 125 Amps, N/A weather head/masthead work, main breaker replacement.City of Sacramento · 2019$2,000
AA: existing panel 125 Amps - Underground service, new main panel 125 Amps, N/A weather head/masthead work, main breaker replacement.City of Sacramento · 2019$2,500
Panel was already upgraded by other Contractor . No permit pulled - Owner requesting permit to legalize work . AA: existing panel 100 Amps - Underground service, new main panel 200 Amps, N/A weather head/masthead work, main breaker replacement. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314
PER BH, RI HAS BEEN PREVIOUSLY INVOICED, APPLICANT IS GOING BACK TO 125AMP.City of Sacramento · 2019$2,111
AA: existing panel 125 Amps - Underground service, new main panel 200 Amps, N/A weather head/masthead work, main breaker replacement.City of Sacramento · 2019$2,500
AA: existing panel 100 Amps - Overhead service, new main panel 100 Amps, Replacement weather head/masthead work, main breaker replacement.City of Sacramento · 2019$2,000
EPC Submittal - Remodel of Commercial Building - Tenant improvement to existing one story commercial building. Remodeling space to a coffee shop. Previous tenant was a convenience store. Previous work issued under separate permit COM-1723650
SEE REVISION COM-1917902: Revised plumbing sheets to include sewage ejector pump
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you ALPHA OMEGA ELECTRIC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to ALPHA OMEGA ELECTRIC's website. It links to this profile so homeowners can see the public permit record behind your work.