EPC - Permit to obtain final inspection only on work commenced on expired permit # COM-2021320;- Electrical service upgrade from 100amp to 200amp service for Comcast Data Hub. Install SMUD secondary box at base of existing pole. Route new electrical raceways from SMUD to 200A meter base. Install new 200A Auto Transfer Switch, 200A fused disconnect and 200a panelboard on new H frame inside building. Remove existing100a Base on side of building, Remove existing 125A generator load disconnect on side. Remove existing auto transfer switch inside com room.
SEE REVISION COM-2212674: Add (1) 100A/2P breaker into proposed new panelboard.City of Sacramento · 2022$33,172
EPC - REVISION TO COM-2021320: Add (1) 100A/2P breaker into proposed new panelboard.City of Sacramento · 2022
Commcast would like to modify this existing electrical site. SOW is on sheet T01 of the plans.Sacramento County · 2021$40,000
Install of two (2) 300 KW generators with bell tank 1092 gallonsCity of Sacramento · 2021
EPC - Electrical service upgrade from 100amp to 200amp service for Comcast Data Hub. Install SMUD secondary box at base of existing pole. Route new electrical raceways from SMUD to 200A meter base. Install new 200A Auto Transfer Switch, 200A fused disconnect and 200a panelboard on new H frame inside building. Remove existing100a Base on side of building, Remove existing 125A generator load disconnect on side. Remove existing auto transfer switch inside com room.
SEE REVISION COM-2212674: Add (1) 100A/2P breaker into proposed new panelboard.City of Sacramento · 2020$221,151
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.