What the public permit record shows, not self-reported reviews.
Is ADAIR GENERAL CONSTRUCTION a real contractor?
ADAIR GENERAL CONSTRUCTION appears in public building-permit records with 43 permits filed through 2026 in and around City of Sacramento, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is ADAIR GENERAL CONSTRUCTION's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to ADAIR GENERAL CONSTRUCTION by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is ADAIR GENERAL CONSTRUCTION licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. ADAIR GENERAL CONSTRUCTION has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is ADAIR GENERAL CONSTRUCTION's work?
The most recent permit on record for ADAIR GENERAL CONSTRUCTION is dated 2026-03-19, with 43 permits on file in total.
Cable Park Facade Project
1. ALL PROPOSED WORK IS LANDLORD WORK. WORK IS NOT FOR OCCUPANCY
2. FACADE REMODEL
3. DEMOLITION OF INTERIOR IMPROVEMENTS AND MEZZANINE
4. CONSTRUCT (N) DEMISING WALL FORMING TWO (2) TENANT SUITES
5. CONSTRUCT (N) FIRE CONTROL/UTILITY ROOM
6. SAWCUT OPENINGS IN EXTERIOR WALL FOR TWO (N) DOORS
7. CONSTRUCT NEW TRUCK DELIVERY AREA.
8. REMOVE (E) INTERIOR ELECTRICAL SERVICE AND REPLACE WITH (N) EXTERIOR SERVICE.
9. REMOVE ALL ROOFTOP MECHANICAL EQUIPMENT
10. INSTALL (N) ROOFTOP MECHANICAL EQUIPMENT
11. RECONFIGURE AND ADD ACCESSIBLE PARKING.Sacramento County · 2026$640,000
Work includes interior alterations, new interior partitions, finishes, fixtures (sales & stock), new RTU's and ductwork, electrical and new plumbing. /*Tenant improvement to an existing building for a new Five Below.Sacramento County · 2026$229,264
1. REMOVE AND REPLACE +- 60SF OF DRYWALL
2. REMOVE AND RE-INSTALL (3) SINKS AND
(1) WATER CLOSET AS REQUIRED TO PERFORM
DRYWALL REPAIRS AND REPAIR LEAKING PLUMBING
WASTE LINES.Sacramento County · 2025$3,500
-Remove and Re-install (2) sinks. Including new in-wall backing for sink attachment.
-Remove water damaged drywall, perform mold abatement and re-install drywall, tape and finish. (approximately 50 SF)
Sink Mounting Repair and Minor Mold RemediationSacramento County · 2025$5,000
CH01 - change to Metal stud framing on sheet A4.0Sacramento County · 2024
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you ADAIR GENERAL CONSTRUCTION?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to ADAIR GENERAL CONSTRUCTION's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
TENANT IMPROVEMENTS TO INCLUDE THE FOLLOWING:
PROVIDE NON-STRUCTURAL TENANT IMPROVEMENTS FOR NEW OFICE SPACE WITHIN EXISTING VACANT SHELL OFFICE SUITE 100. IMPROVEMENTS TO INCLUDE MECHANICAL, PLUMBING AND ELECTRICAL WORK., CH01 - change to Metal stud framing on sheet A4.0Sacramento County · 2024
$105,720
SCOPE OF WORK INCLUDES RENOVATING FACTORY VESTIBULE (162 SF) TO PROVIDE ADDITIONAL WALL AND DOORSacramento County · 2022$8,420
SCOPE OF WORK: NON STRUCTURAL PARTITIONS, ELECTRICAL, NEW LED
LIGHTING, MECHANICAL AND FINISHESSacramento County · 2021$40,033
EPC - EXPEDITED - interior improvement in suite 115 for fitness amenity at Gateway Oaks. The scope of work includes a fitness area with yoga room, locker area, changing rooms and two new restrooms with showers. MEP & FS will be provided to accommodate new layout.City of Sacramento · 2025$223,600
EPC - EXPEDITED - THIS PROJECT IS A TENANT IMPROVEMENT IN SUITE 100.
SCOPE OF WORK INCLUDES REMOVING AND REPLACING ALL EXISTING 2'1\2' AND 2'1\4' LIGHTS WITH NEW LED FIXTURES, REMOVAL OF EXISTING CARPET TILE, BASEBOARDS AND LVT FOR NEW FINISHES, AND DEMO WORK TO EXISTING WALLS AND CEILING FOR NEW OFFICE LAYOUT MECHANICAL, ELECTRICAL AND FIRE SPRINKLERS WILL BE REVISED TO ACCOMMODATE THE NEW CONFIGURATION.City of Sacramento · 2025$184,600
EPC - EXPEDITED - THIS IS A TENANT IMPROVEMENT TO EXISTING SUITE 120. THE PROJECT IS TO ADD A NEW CONFERENCE ROOM,
BREAK-ROOM, AND WELLNESS ROOM ALONG WITH NEW CASEWORK WITH SINKS. SUITE 120 WILL ALSO BE
EXPANDING INTO THEREFORE, NO IMPROVEMENTS IN THE SUITE WILL BE MADE UNDER THIS PERMIT. ALL LIGHT
FIXTURES IN SUITE 120 WILL BE REPLACED WITH NEW LED FIXTURES.
MECHANICAL AND ELECTRICAL WILL BE REVISED TO ACCOMMODATE THE NEW LAYOUT OF THE TENANT IMPROVEMENT.City of Sacramento · 2025$191,462
EPC - EXPEDITED - THIS IS A LANDLORD WORK PROJECT TO CONSTRUCT A 0-HR CORRIDOR ON THE FIRST FLOOR OF AN EXISTING
TWO-STORY BUIL-DING. THE CORRIDOR WILL RUN THROUGH THE CENTER OF EXISTING VACANT SUITE 110. SUITE
110 WILL BE DIVIDED INTO TWO SUITES AS A RESULT OF THIS NEW CORRIDOR, SUITE 110 AND SUITE 120.
FUTURE TENANT IMPROVEMENT OF NEW SUITES 110 AND 120 WILL BE UNDER A SEPARATE PERMIT. AN EXISTING
ELECTRICAL ROOM WILL REMAIN. MINOR MODIFICATION TO THE ELECTRICAL ROOM IS TO RELOCATE THE ROOM DOOR TO THE NEW 0-HR CORRIDOR.
MECHANICAL AND ELECTRICAL WILL BE REVISED TO ACCOMMODATE THE NEW 0-HR CORRIDOR.City of Sacramento · 2025$68,513
Permitted projects on public record. Addresses are omitted for privacy.