What the public permit record shows, not self-reported reviews.
Is A TECH ELECTRIC AND MECHANICAL a real contractor?
A TECH ELECTRIC AND MECHANICAL appears in public building-permit records with 18 permits filed through 2026 in and around City of Sacramento, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is A TECH ELECTRIC AND MECHANICAL's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to A TECH ELECTRIC AND MECHANICAL by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is A TECH ELECTRIC AND MECHANICAL licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. A TECH ELECTRIC AND MECHANICAL has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is A TECH ELECTRIC AND MECHANICAL's work?
The most recent permit on record for A TECH ELECTRIC AND MECHANICAL is dated 2026-05-28, with 18 permits on file in total.
Like for like - HVAC full gas split systemSacramento County · 2026$10,000
Changeout to existing HVAC system only. No additional electrical, mechanical, plumbing, or structural work permitted.; like for like full split system change outSacramento County · 2026$13
Changeout to existing HVAC system only. No additional electrical, mechanical, plumbing, or structural work permitted.; change out gas furnace ONLYSacramento County · 2026$4,500
Changeout to existing HVAC system only. No additional electrical, mechanical, plumbing, or structural work permitted.; Changeout to existing HVAC system only. No additional electrical, mechanical, plumbing, or structural work permitted.; full Gas split system change outSacramento County · 2026$10,000
Changeout to existing HVAC system only. No additional electrical, mechanical, plumbing, or structural work permitted.; Like for like - 3TON gas full Upflow splitSacramento County · 2025$10,000
Weather head damage - tree fell onto line and damaged Weather headSacramento County · 2025$500
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you A TECH ELECTRIC AND MECHANICAL?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to A TECH ELECTRIC AND MECHANICAL's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
No Duct Work Permitted. Change-out Split System to Split System. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%.City of Sacramento · 2025
$10,000
No Duct Work Permitted. Change-out Split System (all-electric heat pump) to Split System (all-electric heat pump). The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%.City of Sacramento · 2025$9,000
No Duct Work Permitted. Change-out Split System to Split System. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%.City of Sacramento · 2025$9,500
No Duct Work Permitted. Change-out Split System to Split System. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%.City of Sacramento · 2025$10,000
No Duct Work Permitted. Change-out Split System to Split System. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%.City of Sacramento · 2025$10,000
Change-out Split System to Split System. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%.City of Sacramento · 2025$9,090
Permitted projects on public record. Addresses are omitted for privacy.