Replace Deck TREX 11.5.25 Remove and replace the existing upper and lower level decks spanning 28’ across the back of the house. The new deck wil be the same design, dimensions, and elevation as the existing. The new decking wil consist of TREX Transcend Island Mist composite deck board using a hidden fastener system. The new substructure wil consist of pressure treated Doug Fir mounted to new concrete footings and ledger to the house. The new railings wil consist of custom black ornamental iron panels with horizontal balusters mounted between 2x2 black posts. the description of work listed above wil be in accordance with Architectural Engineered Plans dated 9.15.25 generated by Above and Beyond Building Design. This line item does not include Architectural Engineered Plans or Permit Fees. This line item does not include the cost of Soil Reports or Erosion control methods at this time.Sacramento County · 2026$22,071
1. TWO EXISTING GARAGE DOORS TO BE REMOVED & REPLACED WITH A SINGLE GARAGE DOOR PER PLAN. SEE EXISTING & NEW FLOOR PLANS FOR FURTHER DETAILS. 2. NEW FOUNDATION TO BE ADDED @ RECONFIGURED WALL AREA PER PLAN. SEE FOUNDATION PLAN & SECTION A-A FOR FURTHER DETAILS. 3. NEW FRAMING TO BE ADDED @ ENLARGED GARAGE DOOR PER PLAN. SEE ROOF PLAN & SECTION A-A FOR FURTHER DETAILS. 4. NEW ELECTRICAL TO BE ADDED AT RECONFIGURED AREA PER PLAN. ALL EXISTING ELECTRICAL OUTLETS & DATA LINES SHALL REMAIN. PLAN SHOWS NEW & ADDITIONAL INFORMATION ONLY. SEE ELECTRICAL PLAN FOR FURTHER DETAILS.Sacramento County · 2025$24,000
1. EXISTING DECK AT 2ND FLOOR TO BE REMOVED & REPLACED W/ NEW PER PLAN. SEE EXISTING & NEW FLOOR PLANS FOR FURTHER DETAILS. 2. NEW FOOTINGS TO BE ADDED THROUGHOUT AREA OF CONSTRUCTION PER PLAN. SEE FOUNDATION PLAN & SECTION A-A FOR FURTHER DETAILS. 3. NEW FRAMING TO BE ADDED THROUGHOUT AREA OF CONSTRUCTION PER PLAN. SEE FRAMING PLANS & SECTION A-A FOR FURTHER DETAILS.Sacramento County · 2025$4,594
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Remove and Replace Redwood Deck Black Iron Rail 4.29.25
Remove and replace the existing Redwood decks and railings across the back of the house. The new decks will be the same dimensions and elevations as the existing. The new decking will consist of 2x6 ConCommon Redwood deck boards using a face mounted deck hardware. The new substructure will consist of Pressure treated Doug Fir mounted to new concrete footings and ledger to the house. The new railings will consist of standard black ornamental iron panels welded up between standard 2x2 black iron postsSacramento County · 2025
$11,118
WINDOWS WERE TO BE REPLACED UNDER PERMIT #CBRR2025-00267. DURING THE WINDOW REPLACEMENT, WOOD ROT WAS FOUND IN VARIOUS LOCATIONS. STRUCTURAL ELEMENTS AFFECTED BY WOOD ROT TO BE REMOVED & REPLACED LIKE FOR LIKE PER PLAN. 3 COAT STUCCO TO BE REMOVED & REPLACED WITH NEW AS NEEDED THROUGHOUT AREA OF CONSTRUCTION. SEE PLAN SHEETS FOR FURTHER STRUCTURAL REPAIR DETAILS.Sacramento County · 2025$15,000
Existing balcony at back of house to be removed and replaced as per plans. Existing doors leading to balcony from master bedroom to be removed and replaced with new. New concrete flatwork to be added at rear yard and concrete walkway t be added at front of property per plan. New footing to be added at balcony as per plan. New framing t be added throughout balcony per plan. New electrical t be added throughout area of construction per plan.Sacramento County · 2025$40,656
Install 9 new trusses and replace old roofing.Sacramento County · 2024
Repair dry rot as needed in the barge rafters and fascia, Install 9 new trusses and replace old roofing., CH-01: Install 9 new trusses and replace old roofing.Sacramento County · 2024$55,000
remove and replace upper existing deck with similare deckSacramento County · 2024$36,000
Remove deck at first floor and balcony at 2nd floor, and replace as per new plans.
add new footings throughout.Sacramento County · 2024$12,064
Structural damage repair caused by a tree falling onto portion of the roof
All damage to be repaired per engineers' recommendationsSacramento County · 2024$78,534
Adding 176 Sq Feet to Remodel our kitchen.Sacramento County · 2024$62,952